Order(MOQ):
1
	Beiben Skip loader 4x2 Northbenz waste truck container garbage truck 
10 CBM BEIBEN SKIP REFUSETRUCK 4x2
◆The Beiben Skip loader cancircularly lift swing arms ON or OFF. It’s cycle time is 60s per time.
◆It’s dumping hopper isseparated from truck body, so the truck can work with several hoppers at thesame time. This also greatly improved the transport capacity of truck.
◆Equipped with dustbin,hydraulic system and operating system
◆Equipped with twoadvanced double acting hydraulically cylinders.
◆Our Skip loader withgood price is particularly for short-distance transport.
Detailed description:
| Chassis type | ND1161 | |
| Cubage( T ) | 7-8 | |
| Parameters | Overall dimension length/width/height (mm) | 8800×2470×3250 | 
| Total Mass(kg) | 14800 | |
| Payload(kg) | 7000 | |
| Kerb Mass(kg) | 7450 | |
| Approach angle/ Departure angle(mm) | 34/20 | |
| Front suspension/rear suspension(mm) | 1245/1405 | |
| Fuel Type | diesel | |
| Fuel Consumption/100 km | 22 | |
| Max Speed | 85 | |
| Engine | Type | WD615.58 supercharged six-cylinder inner-coolingdiesel engine | 
| Displacement/Power(kw) | 9726/175(240hp) | |
| Manufacturer | Weichai Diesel Engine Co., Ltd | |
| Type | 6-in-line supercharged inner-cooling diesel engine | |
| Chassis | Drive type | 4×2 | 
| Wheelbase(mm) | 3800 | |
| Tread(front/rear) | 1940/1860 | |
| Front axle | 5T | |
| Rear axle | 10T | |
| Steering gear | Dual-armed steering wheel,power steering | |
| Transmission | 6 gear mechanical drive transmission | |
| Clutch | Diaphragm clutch, hydraulic remote control,pneumatic serveo | |
| Braking system | Split air braking system,spring breaking,exhaust braking | |
| Cab | Non-longheaded one and a half row cab,whole metal-enclosed | |
| Number of spring axle(front/rear) | 9/11+8 | |
| Tire Type | 10.00-20 16PR | |
| Air-condition | Choose to fix | |
| Special performance parameters | Hydraulic system pressure | 16MPa | 
| Crane arm turn radius | 2400mm | |
| Hydraulic systemFlow capacity | 50L/min | |
| Crane arm maximum pivot angle | 145 | |
| Hoisting time | 30s | |
| Unloading time | 50s | |